iProtect Roadmap

1. Introduction

A detailed schedule will be issued for the current and upcoming release. Planning for a release runs approximately over a time frame of 3 months.
Once development has started, a new schedule is made with stakeholders for the next release.

2. Planning

2.1. IPROTECT: Release 10.4

Jan2023FebMarAprMayJunJulAugSepOctNovStart of 10.4iProtect GOLD release
10.3
Nieuwe strook
10.4 Simons Voss
OS. based

Dom support in iProtect Mobile access

Minimize impact: iProtect update

iProtect functionality: On/Off

Testing 10.4

Bug fixing / maintenance

O.S. Security

iProtect Security

Minimize impact: iProtect update

Meta data / Postgresql

Fairplay

Maintenance SV-VCN

Support of PIN code keypads ( Simons & Voss - Wireless online)

Support 802.1x server

DOM support in iProtect Mobile Access

2.1.1 Details release 10.4

Priority

Description

Type

Short description

Ticket

Time estimate

FAT date *

SAT date *

Project leader

Notes

1

DOM support in iProtect Mobile Access

strategic

Sales

PBS-268 - Getting issue details... STATUS

2

Minimize impact: iProtect update (Local database Pluto)

strategic

iProtect CLOUD

ACT-1999 - Getting issue details... STATUS

3

iProtect functionality: On/Off

strategic

ACT-2445 - Getting issue details... STATUS

3wk

4

DORMA KABA (OSS)

5

Support 802.1x on Server

Customer

PI

AP-157 - Getting issue details... STATUS

2wkn

6

?

SimonsVoss Maintenance

Maintenance

Ticket and issues will be reviewed. Not all tickets will be solved because of the time.

ACT-1145 - Getting issue details... STATUS

3wk

7

1

Support of PIN code keypads ( Simons & Voss - Wireless online)

Customer

Windmill park TKH Germany

ACT-3463 - Getting issue details... STATUS

august 2023

Marcel van Kersbergen

8

Fairplay Certus / 20face

strategic

4wkn

Peter vd Brink

9

Meta data

strategic

Preparation for PostgreSQL

ACT-2124

  • Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) are collectively referred to as commissioning. It is part of the Good Engineering Practices.

1

Priority

Description

Type

Short description

Ticket

Time estimation

FAT date *

SAT date *

Project leader

Notes

2

Pluto: Support ACaaS (“VPN”)

?

?

2.1.1.1 Details: DOM support in iProtect Mobile Access

Jan2023FebMarAprMayJunJulAugSepOctNovDecPilot releaseiProtect GOLD releaseFirst releaseClosing release
10.4

Fix existing OSS (DORMA KABA / SV / DOM OSS)

Testing 10.4

Bug fixing / maintenance

O.S. Security

iProtect Security

Sent invitation to mobile through iProtect

Access when presenting a mobile device on an offline lock throught Cosmos Access

Access when presenting a mobile device on a Sirius iX through Cosmos Access

Support DOM lock event upstream through Cosmos Access and iProtect

Support DOM RF/NM

Meeting DOM

Architectural design

Support DOM lock event upstream through Cosmos Access and iProtect

Password management

Backup Bridge

Linking a lock to bridge

Linking a lock to a door

Scheduled tokens

Multi Node support

Reorganize events

Support DOM RF/NM

Configure RF NM in iProtect (Link readers)

Reader state (Automatic/Open/Closed)

Pulse reader

Reorganize events

Battery management (events / status)

Multi site code support

1

Short description

Estimated time line

Finished

2

Support DOM online cylinder and door handles through iProtect

 

Target date: 1-04-2022

 

 

  •  
3

Sent invitation to mobile through iProtect

  •  
4

Access when presenting a mobile device on an offline lock throught Cosmos Access

  •  
5

Access when presenting a mobile device on a Sirius iX through Cosmos Access

  •  
6

Multiple Node support

  •  
7

Password management

  •  
8

Backup Bridge

  •  
9

Linking a lock to a bridge

  •  
10

Linking a lock to a door

  •  
11

Support DOM RF/NM

ACT-3073 - Getting issue details... STATUS

  •  
12

Configure RF NM in iProtect (Link readers)

  •  
13

Reader state (Automatic/Open/Closed)

ACT-3617 - Getting issue details... STATUS

  •  
14

Pulse reader

ACT-3616 - Getting issue details... STATUS

  •  
15

Fix existing OSS (Dorma Kaba, DOM OSS, Assa Abloy,)

  •  
16

Reorganize events

  •  
17

Scheduled tokens

In progress

  •  
18

Support DOM lock event upstream through Cosmos Access and iProtect

BB-1674 - Getting issue details... STATUS

  •  
19

Battery management (events / status)

ACT-3639 - Getting issue details... STATUS

  •  
20

Multi site code support

ACT-3706 - Getting issue details... STATUS

  •  
21

  •  

2.2. iProtect release 10.5 (before 31-12-2023)

Priority

Description

Type

Short description

Ticket

Time estimation

FAT date *

SAT date *

Project leader

Notes

1

1

Single sign-on

Strategic

PI

PBS-116 - Getting issue details... STATUS

1m + 2m

April 2023

December 2023

Needed: a functional description @Mark knops

2

1

Implementation - Support biometrics

Strategic

ICC / Eurojust

PBS-212 - Getting issue details... STATUS

4wkn

Q1 2024

Which hardware/reader are we going to support? Prices?

3

1

Deister improvements

Customer

PI

ACT-3471 - Getting issue details... STATUS

2wkn

4

1

UTC time

Strategic

Preparation for PostgreSQL

ACT-164 - Getting issue details... STATUS

4wkn

5

1

Integration of pagerservices

Customer

PI

?

June 2023

Q1 2024

Mark Knops

PI Zwolle: Minimaal de volgende gegevens dienen vanuit het toegangscontrolesysteem te worden opgehaald: naam; personeelsnummer; functie; afdeling

6

Support of Tatile Vega BASIC MK2 (STARK platform)

Customer

C&C partners

ACT-3464 - Getting issue details... STATUS

Leszek Schmidt

7

ANSSI certificering

Strategic

France

  • Factory Acceptance Testing (

FAT) and Site Acceptance Testing (SAT) are collectively referred to as commissioning. It is part of the Good Engineering Practices.

4.1 Other parts, Not iProtect related

1

Priority

Description

Type

Short description

Ticket

Time estimation

FAT date *

SAT date *

Project leader

Notes

2

Reader manager: Empty biometric container PHG to re-use the card

CC

1wk

Needed: a functional description (@Sander Zonnveld)

3

Reader manager: Security update

SR

Secure communication with the reader

4

OSDP t=cl support

SR

3.1 iProtect release 10.6 (2024)

1

Priority

Description

Type

Short description

Ticket

Time estimation

FAT date *

SAT date *

Project leader

Notes

2

CUSTOMER

Customers would like an export regarding the access rights, but then seen from the reader/door.

Customer

NS

ACT-3349 - Getting issue details... STATUS

Mark Sloot

3

CUSTOMER

Export (CSV) possibility: Hardware overview per line

Customer

NS

ACT-3348 - Getting issue details... STATUS

Mark Sloot

4

User login of the TANlock should be changed after iProtect has started the communication with the TANlock

Maintenance

Security

ACT-2623 - Getting issue details... STATUS

TANlock will implement this end Sept. 2023

5

We should be able to use more card technologies with TANlock

Customer

Sales request

ACT-2625 - Getting issue details... STATUS

TANlock will implement this end Sept. 2023

6

Simplify the line dialog

Maintenance

ACT-3127 - Getting issue details... STATUS

7

Update jasper reports (deprecation)

Maintenance

Security

ACT-1465 - Getting issue details... STATUS

8

No logout button in maintenance page

Maintenance

Security

ACT-1599 - Getting issue details... STATUS

9

Img, video and canvas (deprecation)

Maintenance

Security

ACT-2645 - Getting issue details... STATUS

10

Use a One Time Password (OTP) for the Java service

Maintenance

Security

ACT-3514 - Getting issue details... STATUS

11

Hide Technical passwords

Maintenance

Security

ACT-3507 - Getting issue details... STATUS

12

CUSTOMER

Standardize Reporting / External event service

Customer

General

ACT-2654 - Getting issue details... STATUS

2wkn

Ziggo, NS

7. Long term roadmap

Ticket

iProtect to new environment (Postgres)

Ziggo, NS, Pro-rail, Politie, Hospital DE https://www.postgresql.org/

New controller line (Pluto / Orion)

DOM: Locker functionality

License structure

TrakaWeb, keyfob management

Card enrollment in iProtect

iProtect: Online (repository) update

Logical and Physical Acces?

Support of Docker container (IPROTECT CLOUD)

TKH Germany, NS, https://www.oracle.com/nl/cloud/cloud-native/container-registry/what-is-docker/

New controller line : Cloud support

Generic TKH reporting mechanism

iX card reader OSDP t=cl support

Reader manager as a Library